Contactsitemap

Hello, welcome to the website of Dongguan Gaoshang Machinery Co., Ltd!

公众号二维码

Dongguan Gaoshang Machinery Co., Ltd.

Dongguan Gaoshang Machinery Co., Ltd. High-end heat press machine takes you!

中文英文 support hotline 400-6556-156
高尚机械
current location: Home » English > News > common problem >

What preparations should the customer do before installing the door?

source: browse: Date:2018-04-04 08:57:19
1. before our installers reach four hours, we must confirm the position of the machine to be placed and confirm the flat surface and no sundries; 2. prepare the 380V electricity and the installation wire (10 square wire) for the installation of the machine; 3. the forklift for unloading, if the crane needs to be predefined in advance, and the crane is confirmed in advance. The goods window, if need to hit the window, please arrange in advance; 4. arrange 2-3 staff members to cooperate with our installer work; 5. notice the machine operator or master in advance to wait for our installers to carry on the operation and safety training of the installation personnel; study carefully during the training.

手机二维码

Copyright reserved by Dongguan Gaoshang Machinery Co., Ltd.
Address: No. 45 Mango Lane, Xintang, Chashan Town,
Dongguan City, Guangdong Province
Tel: 0769-86866158 400-6556-156
Email: 13925556156@163.com